PROJECT UPDATE: VMC Pre-Cast Concrete

Precast double-tee concrete structure was chosen in the design of the fourth floor Banquet Hall to allow for an open, columnless floor space.  The design of the banquet hall ceiling incorporates HVAC, lighting, and acoustic panels within the linear orientation of the double-tee structure. All thirteen units of these pre-cast elements were lifted into place in one construction day to complete the floor area.